ESDS Deemed Measures Checklist Form ESDS Deemed Measures Checklist Property Information Property Address: Audit Date: Inspector/Auditor: Envelope Efficiency Measures: Mandatory ESDS THERMAL BOUNDARY - Single-Family Attic Insulation Existing R-value: Select existing condition R-19 or below Above R-19 Action Taken: Wall Insulation Cavity Type: Select cavity type Closed Cavity Open Cavity Existing Condition: Select existing condition No insulation No substantial contact Action Taken: Floor Insulation Existing Condition: Select existing condition No insulation No substantial contact R-19 or below Action Taken: PIPE & DUCT INSULATION Heating/Cooling Duct Insulation Duct Location: Select location Conditioned Space Unconditioned Space Duct Type: Select type Rigid Flex Existing R-value: Action Taken: Ventilation Duct Insulation Action Taken: Hot Water Distribution Pipe Action Taken: Pressure Boundary: Mandatory ESDS Energy Audit Air Leakage Testing Baseline Result: Zonal Pressure Boundary Test Building Type: Select type Buildings with attic Buildings with crawl Both attic and crawl Blower Door Assisted Air Sealing Post-Sealing Result: Duct Sealing/PTCS PTCS Result: Recessed Can Lights Existing Condition: Select condition IC Rated Air Tight Can Non-IC Rated Can Action Taken: Heating/Cooling System: Mandatory ESDS Replacing Heating/Cooling Systems Existing Condition: Select condition Failing, inadequate Inefficient equipment (70% gas) Oil/LP Replacement System: Note: Installation of oil or propane fueled equipment prohibited. Windows and Doors: Optional ESDS Prime Window Replacement U-factor: SHGC: Low-E Storm Window Air Leakage Rating: Insulated Exterior Door Door Specifications: Optional ESDS: Evergreen Standard Optional 2 credits if all windows are replaced Additional Notes & Comments Export to Excel Print Form Clear Form